Skip to content
vorlyo

Outdoor spaces and grounds: Digital job cards for paving contractors

Digital job cards for paving contractors with the laying plan, falls, levels and materials for each area, so the crew on site knows exactly which way the water has to run.

Digital job cards for paving contractors. A digital job card that tracks preparation, execution and handover. Example with demonstration data.

What a job card for paving contractors should hold.

On site, crews at paving contractors often work from a printed sketch, a few measurements on the back and whatever the foreman remembers. Which way the fall runs, where the channel drain goes and how high the step at the front door should be is not always written down. When a paver moves between jobs, that knowledge goes with him. Afterwards it is hard to say who decided to turn the bond or why an extra row of edging was used. Extra work is agreed verbally and only turns up on the invoice.

Digital job cards for paving contractors

Example
  1. 1

    Hand over plan and levels

    Done

    The job card holds the laying plan for each area with bond, direction, fall and levels at the house wall, drains and pavement.

  2. 2

    Record progress per phase

    In progress

    After break-out, earthworks and laying, the foreman takes photos and ticks off the phase.

  3. 3

    Walk the handover with the customer

    Next

    At handover the foreman goes through the points with the customer: falls, junction with the house, jointing and clean-up.

From preparation to signed-off card.

Hand over plan and levels

The job card holds the laying plan for each area with bond, direction, fall and levels at the house wall, drains and pavement. Channel drains, gullies and edging are drawn in. The crew also sees which pavers belong to this area and where they are stacked on site.

Record progress per phase

After break-out, earthworks and laying, the foreman takes photos and ticks off the phase. A deviation, such as a cable at an unexpected depth or a gully that has to move, is recorded with a photo and a reason. The estimator sees it the same day and can decide whether it becomes extra work.

Walk the handover with the customer

At handover the foreman goes through the points with the customer: falls, junction with the house, jointing and clean-up. The customer signs off on a phone or tablet. Open points get their own line, so they do not linger until the customer rings.

No more paper and loose photos.

At paving contractors, job cards are often paper forms, photos in a group chat and hours on a timesheet. We decide which details carry over from the quote to the job card, such as areas, bond and materials, and which the foreman adds. Hours can stay in the current time recording if it works. Photos are linked to the job rather than vanishing into a chat. The foreman owns what happens on site; the estimator owns what the order said.

Detailed plan or just the essentials

An experienced foreman needs little more than area, bond and direction of fall. A newer paver benefits from a drawing with measurements. A job card can show both: the essentials at the top, the detailed drawing one tap away. What matters is that levels at the house and drains are never missing, because that is where water complaints start later.

Extra work now or after approval

Some deviations have to be fixed straight away, such as a broken drain connection that is exposed during digging. Others can wait for approval. The job card records per deviation whether the work was done immediately with the customer's verbal agreement or whether it waits for a proposal from the office.

Paper backup or fully digital

A phone in a sandy excavation is not always practical, and signal behind a house can be poor. A job card that works offline and syncs later solves a lot. Some crews keep a printed laying plan as backup, as long as photos and sign-offs are done digitally so the file stays complete.

What goes on the job card.

At the start the job card holds the laying plan, levels and materials per area, sign-off per phase with photos, deviations with a reason and the handover with signature. One crew uses it first, then the rest. Together we walk through an ordinary patio and a driveway where an unknown pipe turns up during digging. Extra work that lands on the invoice by itself and hours that flow in from time recording can be switched on once all crews are on board.

View pricingSupport and updates
Question not listed?Just ask. You get an answer from our team, not a bot. WhatsAppChatEmail
Does the job card work without signal on site?

Yes. The job card is loaded onto the device in advance and works offline. Photos and sign-offs are stored and sent once there is signal again. A crew working in a back garden with no reception can carry on as normal.

How do we record extra work so it is not disputed later?

The foreman records the deviation with a photo, a short description and whether the customer agreed verbally. The office turns it into a proposal using the quote rules. The customer sees the photo and the proposal together, so it is clear what was found and why it was extra.

Can pavers change the laying plan themselves?

They can propose a change, for example turning the bond to reduce cutting along a wall. The foreman or estimator approves it and the change is stored with a reason. Everyone can later see why the work differs from the drawing.

What exactly does the handover record?

The handover records for each area whether falls, junctions and jointing are accepted, with photos and any open points. The customer signs. If a complaint about puddles by the front door comes in later, the levels and handover photos are there to check.

Job cards that come back complete.

Start with a short intake. Then we schedule a call to show the software with your services, team and way of working.

Ask a question No obligation · reply within one working day
WhatsAppinfo@vorlyo.com
Your intakeDigital job cards for paving contractors Being filled in Ready for the call
What you want

Digital job cards for paving contractors: laying plan with falls, levels and materials per area, plus photos and extra work recorded from site.

Parts
  • Hand over plan and levels
  • Record progress per phase
  • Walk the handover with the customer
What happens next
Intakenow, a few minutes
Call and demoafter our reply
Setuptogether with you
Liveonce everything is ready
Price Investment and licenceA one-off investment in your software and a fixed monthly licence for hosting, updates and support. You hear the amounts in the call.

Vorlyo

AI assistant · our team takes it from there

Ask about the software for your industry, how it is priced or your website. Prefer to hear from our team? Leave your details here.

AI assistant, can make mistakes. Do not share sensitive data. Privacy